Construction of OBAYASHI MORI SORA MIRAI, now underway for GREEN×EXPO 2027, has progressed with safety as the top priority since work began in February 2026. This report introduces scenes from the construction site as the exhibition pavilion takes shape, with an emphasis on environmental considerations and sustainability.
Excavation and ground improvement work were carried out to construct the underground foundation that supports the building. CleanCrete™ (*1), a low-carbon concrete, was used for the foundation concrete.
Excavation and ground improvement work were carried out using hydraulic excavators to build a stable foundation.
A thin layer of blinding concrete was placed to accurately set the building’s position and elevation, followed by reinforcing bar assembly to strengthen the foundation.
After reinforcing bar work was completed, formwork was assembled around the reinforcement to maintain the specified shape during subsequent concrete placement.
As concrete (CleanCrete) is poured, vibrators are used to remove trapped air from within the concrete and compact it evenly.
Shoring materials, which are typically used during excavation to prevent surrounding soil and other materials from flowing into the work area, were used as part of the structural frame, including the columns and beams. Scaffolding materials were then assembled on top of the concrete around the outer perimeter as support members for the exterior cladding.
The reddish-brown members shown here are shoring materials used for the columns and beams of the pavilion.
For the cylindrical buildings at both ends, scaffolding materials are being assembled by crane outside the shoring materials as exterior support members.
Installation of the wood-based exterior panels has begun, and the overall outline of OBAYASHI MORI SORA MIRAI is becoming visible.
Each wood-based exterior panel has a different tone and grain pattern. After the exposition, the panels will be processed and reused as temporary fencing and other materials at construction sites.
Going forward, work will move into interior finishing and building services, including electrical and air-conditioning systems. Around winter, finishing work is scheduled for the exterior areas, including planting. The team is also working on the exhibits as it moves toward completion in February 2027.
Obayashi Corporation will continue to help communicate the appeal of GREEN×EXPO 2027 while sharing, in Japan and overseas, the sustainable future society envisioned by the Obayashi Group and the spirit behind the Group’s brand vision, “MAKE BEYOND.”
A low-carbon concrete developed by Obayashi Corporation. CleanCrete replaces most of the cement with industrial by-products such as ground granulated blast-furnace slag, enabling a substantial reduction in CO2 emissions.